Construction of a new high efficiency freezer and chiller with a modern an wooden building looks.
Dismantling of rooms, installation of structures, installation of communications systems, installation of a ventilation system, installation of medical personal call system.
Production and mounting of custom made furniture for RSU student information center.
Dismantling of rooms, installation of structures, installation of communications systems, installation of a ventilation system, installation of laboratory equipment and systems, woodworks, wall panels, kitchen and furniture.
Dismantling of rooms, installation of structures, installation of communications systems, full interior finishing, installation of cargo lift, installation of furniture.
Construction of another stage of houses in village Ekociems Trenči. Starting from project design till the improvement to the territory.
Dismantling of rooms, installation of structures, installation of communications systems, full interior finishing, installation of furniture.
Making design build project and receiving all permits, dismantling of rooms, installation of structures, installation of communications systems, installation of a ventilation system, installation of furniture, renovation of old wooden door.
Making design build project and receiving all permits, dismantling of rooms, installation of structures, installation of communications systems, installation of a ventilation system, installation of furniture.
Dismantling of rooms, installation of structures, installation of communications systems, installation of a ventilation system, installation of laboratory equipment and systems.
Dismalting the old wooden shingle facade, replacement of damaged parts, wood works, installation of observation cabin, electrical work, new wooden shingle facade improvement to the territory. Construction work at a height.
Working together with architects from Open AD to create new office for 4finance.
The challenge: To ensure that the construction was in accordance with Norwegian standards and laws.
Renovation of the historical building was done in stages so as to amortise the investment. Facade work, interior design.
Renovation of facades, restoration and replacement of windows and doors, reconstruction of interiors, installation of communications systems, finishing work.
The challenge was to renovate the train stations while preserving their historical value and maximally allowing them to continue their work. The work was done as quickly as possible.
Construction of a new building, adaptation of an existing one – construction of the foundation, walls, engineering networks (heat, ventilation, air conditioning, electricity, water, sewage), lightning protection, low-voltage systems, improvements.
Installing biogas equipment in partnership with Host Bio-energy installations worldwide.
Scope of work: Examining necessary documents and permits before beginning the work, preparation of the building lot, dismantling, earth work, new foundation, wood works, installation of observation cabin, electrical work, improvement to the territory.
The challenge: Construction work at a height and historical site
Work: Reconstruction of the towers, examining necessary documents and permits before beginning the work, preparation of the building lot, dismantling, earth work, cementing of foundations, assembly of towers, installation of observation cabins, electrical work, improvement to the territory.
The challenge: Construction work at a height.
Scope of work: Facades, insulation and renovation of roofs, internal renovations of walls, ceilings and floors
The challenge: To do the work as quickly as possible by concentrating forces so as not to disturb the work of the educational institutions
Scope of work: Replacement of the load-bearing structures of the building, strengthening of ceilings, rebuilding of the roof, completely altered internal floor plans, full replacement of all engineering systems, full finishing of the building.
The challenge: While beginning the reconstruction of the wooden building that was built in 1928, it was found that 70% of the building was run down.
Scope of work: Replacing roof insulation, insulating the façade, replacing windows and doors, renovating rooms, reconstructing water, sewage, ventilation and heating systems, establishment of a low-voltage electrical and lightning protection system, installation of a lift.
The challenge: Do the work without disturbing the work of the local government.
Scope of work: Dismantling of rooms, installation of structures, installation of communications systems, installation of a ventilation system, installation of cleanroom equipment and systems, starting the cleanroom.
The challenge: The greatest challenge was to ensure the satisfaction of the ISO 8 and LV EN ISO14644-1 standards for cleanrooms.
The challenge: To use the most environmentally friendly materials possible in the construction work, including wood chip roofs, reed roofs, green roofs and titanium zinc. All of the homes have heat pumps and recuperation systems.
Scope of work: Facade work, reconctruction of attic in to loft, interior design
The challenge: To preserve the historical appearance of the building and to do the work in stages so as to amortise the investment